Project

Dhule 200MWac/386MWp Solar Project

Location

Dhule

Capacity

200MWac/386 MWp

Type

Solar

Project Overview

Located in Mhasale village, Sakri Taluk of Dhule District in Maharashtra, the project envisions to harness the abundant solar resource and convert it to green electricity by using Mono PERC Crystalline – MBB Technology. The 220 KV Grid Substation where power will be evacuated from the Project is located in Shivajinagar village, Sakri at ~11 km distance from the Project site. The substation is surrounded by agricultural land and the TL route passes predominantly through agricultural lands in the villages of Bhadgaon, Bhamer,Shivajinagar, Raypur and Vardharne.

The total estimated land required for the Project is 380.8 ha

The commissioning status is as below:

  • AMPYR 12 – 60 MW in 2027; (Target)
  • AMPYR 12A  -50 MW on 27 May 2025; (operational)
  • AMPYR 12 B -40 MW in May 2027;  (Target) and
  • AMPYR 12 C -50 MW in 2027 (Target)
social_1111-1024x505

Estimated Project Impact

50 MW
operational capacity
114 GWh/year
clean electricity
93,732 tCO2eq/year
emissions avoided
250
construction jobs
1,12,654
people reached

Grievance Mechanism

Ampyr has a robust grievance mechanism to record and resolve complaints both internally and externally. Stakeholders receive periodic training on the process, and public disclosures ensure awareness through project boards, newspaper ads, and more. Grievances, whether oral or written, are recorded by a designated coordinator at each site, reviewed, investigated, and resolved per the project’s ESMS. Data is monitored to track grievances by gender and identify patterns, systemic issues, and community feedback. Click here to read our full ESG policy for India. 

Complaints can be registered with the independent Grievance Redressal Mechanism of GCF here or directly with us here.